PRODUCTION


ICAS operates in Superconductivity and Cryogenics R&D and production, mainly in the design, manufacturing and testing of superconducting devices for power electronics, as conductors and small to medium size magnets.
The main on-going and completed productions are listed in the following:



On-going productions


DTT Logo
2021
Supply of CIC conductors for the superconducting magnetic system of the
DTT - Divertor Tokamak Test facilty reactor.
CERN Logo
2019
Supply of MgB2 Cable Assemblies for the HL-LHC Superconducting Links.
ITER Logo
2019
Manufacturing of the ITER In-Vessel Coils Conductors (Mineral Insulated Copper Conductors).


Completed productions


IPP Logo
2020
Manufacturing of Tefzel Insulated internally cooled Cu conductors, with stainless steel jacket, for the ASDEX Upgrade fusion experiment at Max-Planck-Institut für Plasmaphysik in Garching (Munich).
ENEA Logo
2019
Manufacturing of n.1 Joint Sample for EU-DEMO TF coils.
2019
Supply of 100m trial conductor and 781m TF conductor for the National Institute for Quantum Technology (QST), in collaboration with Kiswire LTD.
ITER Logo
2017-2018
Qualification Phase for the production of the ITER In-Vessel Coils Conductors (Mineral Insulated Copper Conductors).
CERN Logo
2016-2018
Qualification and supply of MgB2 cables for the HL-LHC Superconducting Link.
F4E Logo
2010-2018
Supply of about 20 km of ITER TF conductors (video), 22 km of ITER PF1/6 conductors (jacketing only) and
of all the JT60SA TF conductors (about 30km). (video)
ITER Logo
2016
Feasibility studies of an alternative design of the ITER In-Vessel Coils Conductors (Mineral Insulated Copper Conductors).
ENEA Logo
2016
6 additional JT-60SA TF conductors
INFN Logo
2015
(contracted to the ICAS partner CRIOTEC Impianti)
Design and manufacture of a pair of current leads for dual operating conditions 10 kA - 20 kA and double cryogen cooling, using superconductive YBCO tapes.
Project developed in collaboration with the Swiss Institute CRPP
NFRI Logo
2015
6 ITER TF conductors supply (about 4.5 km, jacketing only)
UNISA Logo
2015
(contracted to the ICAS partner CRIOTEC Impianti)
Winding, Heat Treatment, and Impregnation of the NAFASSY large bore magnet (pictures),
wound with a Nb3Sn CICC
KAT Logo
2014-2015
Manufacturing of one ITER TF conductor (jacketing only)
HFML Logo
2014
Manufacturing of Nb3Sn CIC conductors for the 45T Hybrid Magnet project
ENEA Logo
2013
Manufacturing of Nb3Sn CIC conductors for the NAFASSY large bore magnet (picture)
VNIIK Logo
2013-2015
Manufacturing of 3 ITER PF samples for test in the SULTAN facility (pictures)
NFRI Logo
2011-2014
All the Korean portion of the ITER TF conductor supply (about 20 km, jacketing only) (video)